Lotte Petrochemicals Fire Jockey Pumps’ Control Panels Upgrade
As with any other petrochemical facilities, safety is of utmost importance and can never be compromised.
Petronas Optimal
The obsolete Peak 150 at Petronas Optimal plant was replaced with the latest Peak 200
Batang Ai HEP
The 30 year old analog turbine governor and hydraulic pilot control to the inlet guide vane requires retrofitting as spares are obsolete.
Kalamuku Mini Hydro governor and power management control retrofit
The Kalamuku mini hydro generator is a Nikki Corpn Pelton type rated at 535 KW x 2 units.
Lotte Petrochemicals Governor’s Retrofit
Lotte Petrochemicals has a requirement to upgrade their ageing mechanical-hydraulic governor, the Woodward PG-PL...
Petronas Chemicals MTBE- PDH
This retrofit project was to replace 2 units of the obsolete Woodward 5009 and Protech to the latest 5009FT and Protech GII respectively on their Reactor Effluent Compressor turbines.
Sungai Selangor Waterworks
The ageing emergency generator control panels at two different water treatment facilities were having reliability issues and is constantly plagued with false trips.
PetroChad
Supplied a generator control panel that enables Auto Mains Failure start, auto-synchronization, auto loading/unloading, generators’ protection and load share with the utility...
Petronas Ammonia
The original BAFCO actuators for this extraction turbine were worn and there is no local support for aftersales service. Spares were hard to obtain as this model is no longer available.
United Plantations Bhd
United Plantation at Ulu Bernam wanted a very complex power management system that enables both new Prime Mill and Optimill which are located about a kilometre apart to load share and assist in providing back up power when needed.